AC EMU Power & Auxiliary Circuits — Real Tap-Changer System

Electrical Engineering EMU and MEMU / Metros Chapter 12/17 20 min read Source: Verified Source
हिन्दी में पढ़ें

Create a free account to track your reading, save important notes and practise this topic.

This chapter describes the real power and auxiliary circuit of an older-generation, tap-changer-controlled AC EMU (as distinct from modern IGBT-based three-phase EMUs) — the exact roof-to-motor circuit path, notch-by-notch tap-changer sequencing, and every auxiliary sub-circuit.

Roof Equipment & Transformer — Real Circuit Path

The pantograph connects to the roof bushing of the 25kV cable via the air-blast circuit breaker (ABB), whose live side carries a surge diverter to earth. A roof-mounted earthing switch has two earthing blades that, in the closed position, contact both sides of the ABB isolator arm — earthing both the pantograph and the transformer primary winding simultaneously.

The 25kV cable from the roof bushing passes through the emergency driving cab and enters the transformer through another bushing, connecting to the primary winding. The transformer's return (secondary-side earth path) is brought out by an insulated cable connected to earth brushes on all four axles' traction motors — these earth brushes are insulated from the motor frames, keeping the transformer return independent of the earthing of equipment cases and underframe.

Primary overload protection uses a relay operated through a current transformer: the primary overload relay (OLP) combines with the earth-fault relay (EFR) as a double-element relay sharing a common set of interlocks and reset coil. Tripping either element opens the ABB; both trip elements carry flags to show which relay caused the trip — the flag stays after an electrical reset and must be reset manually.

Real ParameterValue
Transformer secondary windingsTwo separate windings, each 350V
First-half tapped sectionDivided into 5 sections of 70V each
Surge-protection capacitors across secondaries to earth2 capacitors, 0.05 μF each
Winding-grouping switch contactsW1 (LV) / W2 (HV) — off-load operation only
Tap-changer contactorsT1 to T9
Reactor used for alternate-notch transitionsTL

In the first half of the notching sequence, only the tapped portion of the secondary is used; for the remaining notches the two sections connect in series. Tap-changer contactors T1-T6 connect to the transformer tappings and select the required voltage; T7 and T8 (with reactor TL) give alternate notches with and without the reactor in circuit — a series resistor is also in circuit with TL, cut out immediately when T9 closes, to ease duty on the opening contactor by reducing circulating current. Selected output voltage feeds through overload-relay trip coils OL5 and OL6 to the main rectifier unit.

Dropping Reactor DL — Real 3 Purposes

Reactor DL sits in series with the output for all notches where only the tapped half of the secondary is in circuit. Its three real purposes: (1) steepen the notching curves on low taps, reducing notching-current swing; (2) increase the transformer's short-circuit reactance on low taps; (3) provide two extra notches, 11 and 12.

Two tertiary windings on the main transformer feed the AC auxiliary machines and DC low-tension circuits respectively.

Tap-Changer Notch Sequence — Real 23-Notch Structure

The tap changer runs through 23 real notches, tied to 4 master-controller positions. Rather than listing every notch's exact contactor combination, the structural landmarks below are what matter most for understanding (and for exam purposes):

Real Landmark NotchReal Significance
Notch 1T1, T7, T9 closed — one 70V section (M3-M4) in circuit with reactor TL in series
Notch 2 — SHUNT notchT1, T8 closed — section M3-M4 direct. Moving the master controller handle to position I lets the equipment proceed automatically up to this notch.
Notch 10T5, T8 closed — full voltage of the tapped half (M3-M8) applied to rectifiers, DL still in series
Notch 11T6, T8, T9 closed — untapped half of winding (M1-M2) now in circuit with TL in series, but DL no longer in circuit
Notch 12 — HALF POWER connectionT6, T7 closed — untapped winding section to rectifier direct. Moving the master controller handle to position 2 (half power) lets notching proceed automatically up to this notch.
Notch 13Moving the handle beyond position 2 throws the winding-grouping switch from LV to HV (W1 opens, W2 closes); transition completes when T1 closes and T6 opens, then T9 closes — connecting the untapped winding plus one tapped section (M1-M4)
Notch 22 — FULL (PUT.I) POWER connectionT5, T8 closed — connecting the full secondary winding (M1-M8) direct. Selected by moving the master controller handle to position 3 (full power).
Notch 23 — WEAK FIELDMoving the handle to position 4 (weak field) closes the four field-weakening contactors F1-F4, giving the highest running speed.
Real Transition Mechanism (Make-Before-Break)
  • Odd → even notch (e.g. notch 1 → notch 2, with T1/T7/T9 closed): transition starts when T8 closes, short-circuiting reactor TL. T7 and T9 then open off-load in preparation for the next transition, setting up the notch-2 circuit (T1, T8 closed).
  • Even → odd notch (e.g. notch 2 → notch 3): transition starts when T2 closes, setting up (in addition to load current through T1 and T8) a circulating current through T2, reactor TL, and the transition resistor (M39-M11). T1 then opens, and the transition completes when T9 closes — this short-circuits the transition resistor, giving the notch-3 circuit (T2, T8, T9 closed).

Transformer Overload Protection — OL5/OL6 Real Logic

Two overload relay coils OL5 and OL6 form a double-element overload relay: OL5 protects against a direct overload from a fault in the rectifier or motor circuits; OL6 protects against four tap-change contactors being closed together simultaneously (e.g. T1, T2, T7 and T8) — electrically impossible under normal interlocking, and detectable only if a contactor fails mechanically. Tripping either OL5 or OL6 opens the ABB.

Rectifier & Traction Motor Circuits

The silicon-rectifier assembly consists of six bridge circuits in parallel, each bridge protected on its AC side by fuses, with a surge-absorbing capacitor and series resistor across the AC input to the rectifier bridges. Rectifier output passes through a smoothing reactor to the motor circuits. The four traction motors are arranged in parallel, connected via four motor contactors M1-M4. Each motor has its own overload relay tripping its motor contactor on overload; direction of rotation reverses by reversing the motor field-winding connections.

Protection FeatureReal Value/Function
Current-limit relay (motors 1 & 3), normal setting625 A — controls automatic acceleration
Current-limit relay, reduced setting550 A — reduced immediately before the notch-10→11 transition, and again before weak field
Current-limit relay setting with any motor cut-out (via MCOS)450 A
Earth Fault Relay (EFR)Trips ABB on an earth fault anywhere in the motor circuit; carries a flag indicating a trip occurred
No-Volt Relay (NVR)Opens traction-circuit contactors on failure of line voltage

Motor cut-out switches (MCOS) let the unit operate with any one motor cut out, or with a whole bogie pair of motors cut out.

Auxiliary Circuits — 266V AC and 141V AC

Two separate real auxiliary circuits exist: nominally 266V AC and 110V DC (fed from a 141V AC circuit). The 266V AC circuit is fed from tertiary winding aux.2 and feeds the static battery charger plus induction-motor-driven auxiliary machines: Oil Pump (OP), two Radiator Fans (KF1, KF2), and Main Rectifier Fan (RF). These are capacitor-start-and-run single-phase induction motors, each protected by its own MCB fuse on the live side. A no-volt relay (NVR) — a DC relay fed by a bridge-connected rectifier — sits directly across the 266V supply, detecting transformer-live failure; on line-voltage failure, NVR drops out and disconnects the traction circuit via contacts NVR1/NVR2, protected by its own MCB. Aux.2 winding is protected against wiring faults by two main fuses, AF1 and AF2, inside the transformer connection chamber.

The 141V AC circuit is fed from a second tertiary winding, aux.1, and protected by fuses AF3/AF4 inside the transformer connection chamber. A rectifier-fed relay LTR proves fuses AF3/AF4 are intact and that aux.1's voltage reaches the auxiliary supply rectifier (ASR); LTR's circuit is protected by an MCB. A surge-suppression capacitor with series resistor sits across the ASR input.

Compressor, Fan & Battery Circuits — Real Train-Line Wires

Emergency Lights, Control Supply & Main Lights

← All Electrical Engineering chapters