Push Pull Train Operation — Real WAP7 System & Procedures

Electrical Engineering Train Lighting & AC Coaches Chapter 5/9 22 min read Source: Verified Source
हिन्दी में पढ़ें

Create a free account to track your reading, save important notes and practise this topic.

Real Key Advantages of Push Pull Trains

The 'push & pull' technique places 2 locomotives — one at the front, one at the back — providing more stability. Generally a train-set has 2 power cars for hotel-load; with push-pull the 2 attached locomotives handle hotel load instead, so power cars can be replaced with coaches, increasing capacity and revenue. Real milestone: the first Pull-Push passenger train over Indian Railways — the CSMT-NZM Rajdhani Express — ran successfully on 13.2.2019 between CSMT and NZM. Real result: this eliminated the need for attaching/detaching a banker locomotive on the Ghat section, and reduced journey time by real 95 minutes between CSMT-NZM.

Real WAP7 Push-Pull Modification (RDSO Scheme)

Per real RDSO letter no. EL/3.1.35/4 dated 11.12.2018, a scheme for modifying WAP7 locos for push-pull operation was issued, implemented in real 5 WAP7 loco pairs of ELS/Ajni. In push-pull mode, one loco is in FRONT of the rake ('Master loco') and one is at the REAR ('Slave loco'). The modification adds an additional BL switch, additional BPFA, and additional LSDJ on the 'D' panel in each cab of BOTH master and slave locos. The real ZTEL switch on the 'A' panel is renamed the ZNN switch, used for negotiating a neutral section.

Real Coupler System — IVC & UIC Couplers

WAP7 locos are provided with real 4 couplers on each cab side: (i) IVC coupler — 2 nos., for power connection of Hotel load; ON command pins of the hotel-load converter are provided in the IVC coupler only. Real positions: LP side for Hotel load converter-2, ALP side for Hotel load converter-1. (ii) UIC couplers — 2 nos.: LP side for Push-Pull operation (with an additional coupler on ALP side for MU provided in real locos 30579 & 30580 only), ALP side for Hotel load converter.

UIC couplers (for hotel-load converter and push-pull operation) provided on the loco cab are FEMALE sockets; IVC couplers (for hotel-load converter power connections) provided on the loco cab are MALE couplers. On the rake side, each power car has MALE sockets at BOTH sides (LH & RH) for push-pull operation — both sockets are connected in parallel. For push-pull operation, one flexible jumper with male & female couplers at either end is required: the male end goes into the LP-side female socket on the loco cab, the female end goes into either of the 2 male sockets on the power car.

A similar jumper connects the rear power car and slave loco. Real note: though both jumpers are 18-pin, their internal wire connection differs — one is called STRAIGHT jumper, the other CROSSED jumper. Push-pull operation MUST use one of each. If a straight jumper connects master loco to front power car, the cross jumper must connect slave loco to rear power car, and vice versa. Real 61375 IEC-compliant communication train line uses modular connectors for this purpose. Real fact: one additional straight and one additional cross coupler is required for locos 30579 & 30580; this modification is planned for extension to all locos.

Real Energisation Procedure — Master & Slave Loco

Real Cock/SwitchReal Master LocoReal Slave Loco
Panto selector switch 85AutoAuto mode
Feed pipe charging cockOpenClose
BP charging cock 70OpenOpen
Emergency exhaust cockOpenOpen
Dead movement cock 47CloseClose
Kaba key IG 38OpenOpen

Real note: in Master loco, panto selector switch 85 must be MANUALLY selected so the rear pantograph is raised. Step 2: connect BP and FP pipe of both locos with the train rake's BP & FP pipe and open angle cocks. Step 3, in slave loco: (a) keep SA-9 released in both cabs, observe '0' pressure on the BC gauge; (b) move A-9/DBC to emergency position — brakes apply on loco and rake; (c) move A-9/DBC to neutral position and remove the handle.

Real Master-Loco Activation Sequence
  • (a) Insert BL key in the additional BL switch on 'D' panel, move from OFF to D — additional LSDJ glows (this activates slave loco). (b) After ~35-40 seconds, slave loco reaches Node 504 and additional BPFA on D panel glows (this is VCU boot-up in slave loco). (c) Move additional BL key from D to OFF and remove it — DDU of slave loco then displays Node 612 (slave loco in 'self-hold mode active'). (d) Insert BL key in 'A' panel, move OFF to D, wait 35-40 seconds — DDU displays Node 504 for BOTH master and slave loco. (e) Energise the locomotive pair from master loco exactly as for a single WAP7 — the push-pull combination can be checked on the train configuration screen.
  • Real fact: if the ZNN switch is OFF, VCBs of both master and slave loco open/close simultaneously via the BLDJ switch. Node information displayed on the master loco's DDU covers BOTH master and slave loco status — slave loco's status is shown in a dedicated 'Slv' column on the master loco's DDU.

Real Neutral-Section Negotiation Instructions

Real Fault Handling in Push-Pull Operation

In push-pull operation, hotel-load converters of the MASTER loco only (if provided) are in service — so IVC & UIC couplers of the Hotel load are provided with jumpers from the front power car ONLY. NO IVC & UIC jumper of hotel-load converter is to be connected between slave loco and rear power car.

Real Dos and Don'ts
  • DO check all jumpers are intact and secured properly. While the train operates in Pull-Push mode, do NOT disturb jumpers. While working Pull-Push mode, the BL Key must NOT be operated in the slave loco.