Pneumatic System — Real Air Supply & Brake Control (WAP5/WAG9)

Electrical Engineering Electric Locos Chapter 19/28 20 min read Source: Verified Source
हिन्दी में पढ़ें

Create a free account to track your reading, save important notes and practise this topic.

WAP5/WAG9 locos have a pneumatic system integrated with electronic controls, supplied by M/s Davies & Metcalfe. The systems in both classes are similar except for minor differences from their different brake riggings (Bo-Bo WAP5 vs Co-Co WAG9) and main-reservoir arrangement. Real reference documents: Scheme B1685 (WAP5 equipment layout), parts list B1685PL1, and the WAG9 schematics/parts-list Annexures 8.3/8.4.

Air Supply — Real Compressor & Reservoir Chain

Two real 2A320D electrically-driven air compressors feed through flexible hoses and 2 compressor check valves into the main reservoir system. Each compressor leg has a safety valve (protecting against check-valve blockage) and an unloader valve (operated by an electro-pneumatic valve on the brake frame). Compressors feed through a single water separator (with auto-drain, operated by the same unloader signal line) into two main reservoirs, each with a manual drain cock and an auto-drain valve (also unloader-signal-operated). Air then passes via a vented isolating cock into the twin-tower air dryer (giving significant dew-point depression), through a final filter (removing desiccant dust), then an isolating cock (a second, wired-closed bypass cock exists for air-dryer problems).

Real Pressure SettingFunction
Compressor governor (single compressor, alternating mode)Cuts between 10 kg/cm² and 8 kg/cm²
Compressor governor (both compressors together)Cuts between 10 kg/cm² and 7.5 kg/cm²
Low main-reservoir governorInterlocks with traction if MR pressure falls below its set point
Duplex check valve (MR-equalising-pipe feed to MR)5 kg/cm² — MR pressure must be at/above this before the valve feeds air, retaining air in the MR system if the equalising-pipe hose bursts
Brake-feed-pipe regulator6 kg/cm² — sets the control-part pressure for the relay valve feeding the brake-feed pipe on trailing 2-pipe stock
Automatic-brake relay valve amplification ratioApprox. 1.44:1 (distributor signal to brake-cylinder output)
Dynamic-brake cut-out EP valve thresholdEnergises (preventing duplicate braking) when dynamic brake exceeds 10 kN
Anti-slip valve build-up/release timeRapid build-up ~1 second; long release ~20-30 seconds (to reapply power with some brake still present)

The main-reservoir supply splits: one leg via check valve into a third 240-litre main reservoir (manual drain cock only), continuing via an isolating cock into the brake frame at port U, splitting to feed the direct-brake-valve pilot supply, brake-cylinder-cutout-valve pilot supply, direct-relay-valve MR supply, and blending-valve MR supply. The other leg enters via port W, splitting further — including via a duplex check valve into the main-reservoir equalising pipe (the through pipe linking one locomotive's MR to another's via hose/coupling/end cock) — letting one locomotive feed another's MR system if its own compressors fail, or letting a slave loco in a multiple consist help feed the lead loco under heavy air demand.

Real Sub-Systems Fed From the Main-Reservoir Equalising Pipe

Automatic Brake System — Real Function Chain

MR supply from port W feeds the flow meter, which supplies air to the direct brake valves (each cab) and to the E70 brake control unit. Any air demand from the direct brake or (more importantly) the E70 unit sets up a pressure differential across the flow meter, reducing pressure in the signal line to the flow meter valve — a high-gain pneumatic amplifier (a Venturi-based device) that turns a small pressure change into a large output-pressure change to the flow meter gauges, with a pressure switch sensing high-flow-demand conditions (e.g. a 'break-in-two'). E70 brake-control-unit charging/brake-pipe-pressure behaviour is detailed in real D&M catalogue A658/2. The brake pipe exits via an isolating cock with auxiliary switch contacts (raising an indication if inadvertently closed, since the brake pipe then won't charge) and passes out through port AA to the through automatic air-brake pipe connecting to other locomotives/trailing stock via hose/coupling/end cock.

The distributor responds to brake-pipe pressure variations against its own control reservoir, supplying a signal proportional to BP fall via the dynamic-brake-cutout EP valve to a volume reservoir and, via a double check valve, to the automatic-brake relay valve — an amplifier taking the distributor's signal and increasing it (approx. 1.44:1) out to the brake cylinders. On the distributor, an EP valve + limiter lets the driver operate a cab pushbutton (PVEF) to remove the locomotive's own automatic-air-brake application while still making a train brake application via the automatic brake pipe — inoperative during an emergency application, ensuring a locomotive brake application always occurs if emergency braking follows a full-service application where PVEF was used to remove it.

Parking Brake, Brake Blending & Direct Brake

Brake Cylinder Feeds, Pantograph Air & Auxiliary Supplies

Real Cab Instrumentation & End-Connection Protection

Real Cab GaugeFunction
Gauge (MR/FP)Indicates main-reservoir pressure (input to brake frame at port W) and brake-feed-pipe pressure (air-supply pipe for trailing vehicles)
Gauge (BP)Shows brake-pipe pressure
Gauge (B.C1/B.C2)Shows brake-cylinder pressure downstream of bogie isolating cocks, for both bogie 1 and bogie 2
Flow meter gaugeDifferential reading between MR pressure at port W and the flow-meter-valve output — indicates air demand on the automatic air-brake pipe, flagging heavy-flow events like a 'break-in-two'

End-connection protection: dummy couplings house the coupling heads of hoses/couplings when the locomotive end isn't coupled. Vented isolating cocks on the headstock isolate the 4 through pipes if end cocks are damaged; the brake-pipe isolating cock specifically has a full-bore vent, so that if it's inadvertently closed on a trailing locomotive, the leading locomotive will be unable to create brake-pipe pressure on the locomotives or train — a deliberate fail-safe rather than a silent isolation.

← All Electrical Engineering chapters