OHE Periodical Overhaul & Re-tensioning

Electrical Engineering Traction Distribution Chapter 16/87 15 min read Source: Verified Source
हिन्दी में पढ़ें

Create a free account to track your reading, save important notes and practise this topic.

Trolley / Cab of Locomotive Inspection of OHE

Inspection of OHE by push trolley enables supervisors and officers in charge of OHE maintenance to closely observe the OHE under their charge, and should be carried out during daytime.

RoleTrolley Inspection Frequency
Depot/OHE in-charge (SE/JE)Once a month, entire section
SSE/ADEE (TRD)Once in 3/6 months, respective section
Sr.DEE/DEE (TRD)At least once a year, entire section, by push trolley or motor trolley

Apart from trolley inspection, officers and senior supervisors shall travel in the cabs of locomotives and EMU trains AT LEAST ONCE A MONTH to observe the general condition of OHE and gain first-hand knowledge of operating conditions.

Periodical Overhaul (POH) — Purpose and Interval

The object of POH is to recondition and restore the installation to the condition it was in when first commissioned — whereas preventive maintenance takes care of wear and tear during normal service and forestalls possible failures through regular inspection and quick attention. POH should be thorough and cover EVERY PART of the installation. POH of OHE is intended on a PROGRAMMED BASIS AT AN INTERVAL OF 4 YEARS. Its aim is a thorough inspection of the OHE, replacing worn-out or damaged parts with parts that have already been reconditioned in the maintenance depots and kept ready. Removed parts are sent to maintenance depots for dismantling, thorough inspection, and reconditioning. Everything covered under annual maintenance is additionally attended to during POH.

🎯
Exam Focus — POH (4 Years) vs Rehabilitation (20 Years) — Do Not Confuse
These are genuinely two different events on two different timescales, both real: Periodical Overhaul (POH) happens on a programmed 4-YEAR cycle and reconditions/replaces worn parts with depot-reconditioned spares — this is routine. Rehabilitation is a much larger, CEE-decided special exercise after about 20 YEARS, following a dedicated condition-monitoring drive, deciding which whole ASSEMBLIES need replacement — not routine, and not on a fixed calendar (it's condition-triggered around the 20-year mark, per fitting condition).

8.1 POH of Cantilever

During cantilever POH, eight specific dimensions are recorded against SED values, following the naming convention below (see the manual's Figure 25 for the single-bracket diagram these letters refer to):

SymbolDescription
aDistance between mast stay-arm fitting and the centre of the catenary suspension bracket
bDistance between the axis of the vertical swivel and the axis of the catenary suspension bracket
cDistance from the bottom cap of the bracket insulator to the axis of the register-arm hook
dHorizontal distance between the centre of the register-arm hook and the axis of catenary suspension
eEncumbrance — the distance between the axis of catenary and contact wire
fThe distance between contact plane and mast bracket fitting
rDistance between contact plane and register-arm axis (assumed horizontal)
hThe vertical distance between top fitting and bottom fitting

8.2 POH of Regulating Equipment

In the POH schedule, a complete set of drum/pulley is removed from the mast and a new overhauled set replaces the old one — done very carefully to avoid line failures. All regulating equipment is replaced by previously-overhauled/new ones, and the removed equipment is sent to depot/workshop for overhaul. The regulating equipment is dismantled and every part checked and cleaned (using kerosene and cloth).

8.2.1 Replacement of ATD at Site

After obtaining a power block with proper message confirmation, testing, and putting discharge rods on the OHE: (1) measure X, Z & Y values and analyse for adjustment during the schedule; (2) put come-along clamps on contact and catenary wire; (3) using a pulley arrangement, put a tirfor of 3 tons for the OHE and 1.5 tons for the balance weight; (4) take load so as to lift the balance weight and pull the catenary, releasing the ATD drum/pulley set; (5) remove the old set and fix the new overhauled set; (6) set the OHE and balance weight in its original position; (7) re-measure X, Z & Y values.

8.3-8.8 Other POH Items

Re-tensioning of Unregulated OHE

Re-tensioning of unregulated OHE, in accordance with the tension-temperature chart, should be done normally at the end of 6 MONTHS from the date of erection, and again at the end of 12 MONTHS. Thereafter, tension should be checked ONCE IN 2 YEARS and re-tensioning done as required.

🎯
Exam Focus — The Re-tensioning Timeline
A clean three-step timeline worth memorizing as a sequence, not just individual numbers: 6 months after erection (first check) → 12 months after erection (second check) → every 2 years thereafter (ongoing). Note this applies specifically to UNREGULATED OHE — regulated OHE has continuous automatic tensioning via the ATD and doesn't need this manual re-tensioning cycle at all.