The Overhead Equipment (OHE) system supplies electrical power to locomotives through a contact wire suspended above the track. On Indian Railways, the standard traction system emphasized in the AEE syllabus is 2×25 kV AC — chosen for its ability to reduce line losses over long electrified sections compared to conventional 25 kV single-phase systems.

Why 2×25 kV AC?

Line Loss Relationship
P_loss ∝ I² × R
Since power loss is proportional to the square of current, doubling the transmission voltage (and thus halving current for the same power) cuts losses to roughly one-fourth — the core reason 2×25kV is preferred for long electrified sections.

Foot Patrolling — What Is Actually Checked

Foot patrolling is a routine OHE maintenance activity carried out by patrolling staff walking the track to visually inspect the condition of the overhead equipment.

Key Points to Remember
  • Contact wire wear (mechanical abrasion from pantograph contact)
  • Insulator condition — cracks, flashover marks, contamination
  • Mast plumbing and alignment (masts must remain vertical, not leaning)
  • Dropper condition and dropper spacing along the catenary
  • Earthing and bonding continuity at masts and structures
🎯
Exam Focus
Questions on OHE maintenance frequently test whether you can distinguish routine foot-patrolling checks from tower-wagon-based seasonal/cyclic maintenance checks — know which checks belong to which activity.
Real Exam Facts — Contact & Catenary Wire Specs
  • Standard cross-section of the Contact Wire in the conventional 25kV OHE system on Indian Railways is 107 sqmm, made of Hard Drawn Copper or Cadmium Copper.
  • The Catenary Wire is made of Cadmium Copper, chosen for its higher tensile strength and conductivity compared to plain copper.
  • The height gauge at level crossings under 25kV OHE electrified sections is set at a maximum of 4.78m from road level, to prevent oversized vehicles from contacting the live overhead equipment.
  • A plumb bob used together with a measuring tape is the standard method to check whether a traction mast has deviated from true vertical alignment.
Related Practice Questions
What is the standard traction voltage system emphasized in the syllabus?
Sample question — see Practice module
Foot patrolling of OHE is primarily carried out to check for which of the following?
Sample question — see Practice module