Comparative Operating Performance — WAP5/WAG9 vs Fleet

Electrical Engineering Electric Locos Chapter 5/28 14 min read Source: Verified Source
हिन्दी में पढ़ें

Create a free account to track your reading, save important notes and practise this topic.

Due to superior TE-speed characteristics and adhesive qualities, WAP5 and WAG9 exhibit superior performance compared to Indian Railways' existing locomotive fleet.

Real Comparative Table — Passenger Locomotives

ParameterWAP1WAP3WAP4WAP5WAP6
Capacity on level22 coach @130km/h22 coach @130km/h26 coach @130km/h26 coach@135km/h / 18 coach@160km/h26 coach@130km/h / 9 coach@160km/h
Capacity on 1/200 grade9 coach @130km/h9 coach @130km/h12 coach @130km/h16 coach @130km/h12 coach @130km/h
HP output38003800500054005000
Max. service speed (km/h)130160140160160
Continuous speed (km/h)7272735073
Axle load (t)18.0518.2519.019.518.86
Unsprung mass per axle (t)3.713.714.222.694.3
Max. starting TE (t)22.4922.4930.826.330.8
Continuous TE13.8t @72km/h13.8t @72km/h19.0t @73km/h22.4t @50km/h19.0t @73km/h

Real Comparative Table — Freight Locomotives

ParameterWAG5HWAG7WAG7HWAG6CWAG9
Continuous HP at rail42005000500060506122
Max. speed potential (km/h)80.0100.0100.0100.0100.0
Continuous speed (km/h)52.050.044.051.150.0
Axle load (t)21.020.522.020.520.5
Unsprung mass per axle (t)4.34.34.34.73.99
Max. TE (t)36.042.045.045.046.9
Continuous TE (t)21.827.030.832.033.1
Max. electrical braking effort (t)20.020.020.020.020.0/26.5
Rheostatic braking speed band27-36km/h27-36km/h27-36km/h27-36km/h27-36km/h
🎯
Exam Focus — WAG9's Real Adhesion Advantage
Real balancing speed with a 4700t BOXN load on level 2° curvature track (1 loco): WAG5H 72km/h, WAG7 87km/h, WAG7H 79km/h, WAG6 92km/h, WAG9 >100km/h. On steeper grades (1 in 200/150/100, 2 locos), WAG9 is often the ONLY class able to haul the same load at all, or does so at the highest speed — e.g. on 1-in-100 with 2 locos, WAG5H and WAG7/7H are marked 'unable to haul' while WAG6 manages 40km/h and WAG9 53km/h. This reflects WAG9's genuinely superior starting tractive effort from better adhesion.

Real comparative starting capability: the number of locomotives needed to start a freight train from rest on a given grade. For a 4700t BOXN load on 1-in-70 grade, WAG5H needs 3 locos while WAG7/7H/6 need 3 as well — but for a 5055t BOXN load on 1-in-60, WAG6 needs 3 locos and WAG9 needs 4; on 1-in-150 with 4700t, WAG9 needs only 2 locos where WAG7/7H/6 also need 2, while WAG5H can't be compared at that exact grade in the table. The consistent real pattern: WAG9 starts the same load with fewer or equal locomotives across most graded scenarios shown.

Real Highlights on Haulage Capabilities (WAP5)

Real Rajdhani/Shatabdi Impact Figures
  • The existing HWH-NDLS Rajdhani Express's total running time reduces by about 30 minutes if run by a WAP5 loco at existing booked speed.
  • If WAP5's full speed potential is used (booked speed 150km/h), the same Rajdhani's running time reduces by about 1 hour 15 minutes.
  • If the existing total running time is kept as-is at existing booked speed, the HWH-NDLS Rajdhani could theoretically be enhanced to a 29-coach train if hauled by a WAP5 loco.
  • The NDLS-JHS running time for the existing 9-coach Shatabdi Express reduces by about 12 minutes if hauled by a WAP5 loco with enhanced booked speed of 150km/h.
  • Another 5 coaches can be added to the existing 9-coach NDLS-BPL Shatabdi Express without losing total running time between NDLS-JHS, if hauled by a WAP5 loco at the existing booked speed.

Real Operational Advantages

Real Maintenance Aspects

← All Electrical Engineering chapters