Operation & Troubleshooting — Real Procedures, Pressures & Diagnostics

Electrical Engineering Electric Loco and EMU Operation Chapter 8/10 30 min read Source: Verified Source
हिन्दी में पढ़ें

Create a free account to track your reading, save important notes and practise this topic.

Real Energizing Procedure — Real 11 Steps

Real Stabling-Dead Procedure — Real 11 Steps

Real reasons: loco trouble/failure; waiting for next train/load; crew unavailable. Real steps: 1) Stable in loop/siding, fouling mark clear. 2) Build air pressure via MCP to real 7.5 kg/cm². 3) Apply loco brakes AND hand brakes. 4) Skids/wooden wedges to secure. 5) Reverser neutral, remove MPJ. 6) Lower pantograph, remove ZPT. 7) Switch off ALL BL switches, remove BL key. 8) HBA to '0', confirm battery voltage '0'. 9) Secure ZPT/MPJ/BL key in locker. 10) Lock door from outside. 11) Hand over keys to Engine Turner/ASM on duty, informing stabling location.

Hand brakes are of 2 real types: (i) straight hand-brake lever type, (ii) screw rod and wheel type.

Real Stabling & Securing of Trains/Vehicles

Case study: a roll-down of a coaching rake at Titlagarh station, during power-reversal of a train from Ahmedabad to Puri — TXR staff manually released the brakes of the entire rake; the rake, without power, rolled down and stopped at the next station, Kesinga yard. Real 3 causes identified: (1) hand brake not applied in the SLR; (2) wooden wedges not placed below the SLR; (3) TXR staff released brakes of the entire rake.

Dynamic Brake & Brake-Power Test — Real Numbers

Precautions Against Wheel Skidding — Real Rules

Working with RSI-Block / Traction-Motor Isolation — Real Current Limits

Cab-Changing — Real Procedure & Real 16-Item Valve Position Table

Real 7-step single-loco cab-changing procedure: 1) Apply loco brake with SA9/loco brake. 2) Switch off DJ, lower pantograph. 3) Remove ZPT/BL key/MPJ from the cab. 4) Close loco/train-brake isolating cocks; put handles in released position. 5) At next cab, fit BL key/ZPT key/MPJ; ZPT at appropriate position to raise pantograph. 6) Close DJ, MPJ forward. 7) Open SA9/A9 isolating cocks, release brake via loco-brake handle.

Real ValveReal Leading Loco PositionReal Trailing Loco Position
MU2BLeadTrail or dead
A9 brake valve handle (removed from cab where not working)ReleaseRelease
SA9 brake valve handle (available in driving cab only)ReleaseRelease
A9 brake valve cut-out cockDriving cab open, rear cab closedBoth cabs closed
SA9 brake valve cut-out cockDriving cab open, rear cab closedBoth cabs closed
A9 differential valve cut-out cockOpenOpen
H5 relay cut-out cockOpenOpen
HB5 relay cut-out cockClose—
On air-brake train (vacuum-brake train open)OpenClose
Distributor valve isolating cock (open at 6 o'clock, closed at 9 o'clock)OpenOpen
Lead and trail cock (cab 1 in WAG5, cab 2 in WAP1)OpenOpen
2" size cut-out cock / MTP cock (near PVI in corridor no.1)OpenOpen
Feed pipe isolating cock (closed for single-pipe, open for twin-pipe)Per system in usePer system in use
Auto drain valve isolating cock on MR1 & MR2OpenOpen
MR equalizing pipe angle cut-out cock (white colour)Open after couplingOpen after coupling
Brake cylinder/pipe equalizing pipe angle cut-out cocks (green colour)Open after couplingOpen after coupling

Real Shunting Operation Rules

Real Precautions Before Reclosing a Tripped DJ

Single loco: when DJ trips (LSDJ bulb glows), before reclosing check (i) relay board for dropped target, (ii) HT compartment visually for overheating/smoke. Reclose only when both are satisfactory. Real note: documented loco-fire cases resulted from crews skipping these precautions.

Multiple loco — 2 real conditions: Condition 1 (road/load permits single-loco haulage) — check leading loco relay target; if clear, trailing loco's panto can be lowered via BLSN and section cleared with one loco; at next stoppage recheck trailing loco and reclose its DJ too if clear. Condition 2 (road/load does NOT permit single-loco haulage) — stop after DJ tripping, examine both locos; if both normal, DJ reclosed and train worked; if either defective and load can't be worked single-loco, demand an assisting engine. Real note: if QLM relay target has dropped, it should NOT be reset.

Real Defective Air-Flow Relay Diagnostic Timing Table

Real air-flow relays that cause DJ tripping: QVMT1 & 2, QVSL, QVSI1 & 2, QVRH, QPH. The DJ trips via Q118 relay with a real time lag that identifies which relay is defective.

Real Defective RelayReal Time Delay to DJ Tripping
QVSL and QPHDJ closes, trips after 5.6 sec
QVMT1DJ closes, trips after 10.6 sec
QVMT2DJ closes, trips after 15.6 sec
QVRHDJ closes, trips after 15.6 sec
QVSI1 & QVSI2DJ closes, trips as soon as one notch is taken

Real isolation method: keep the concerned relay's programme switch at III, then bring each relay's switch to 'I' one by one — the one causing tripping at 'I' is the defective relay; keep its switch at III (isolated), others returned to I. Real pilot-lamp indications (single loco): LSOL glows; LSDF, LSCHBA, LSGR, LSB glow; VA meter shows voltage. Real multiple-loco reflection: a trailing-loco defect shows in the LEADING loco's LSOL per the same timing pattern, while the trailing loco itself shows the real delay directly; whenever the trailing loco's DJ trips, the leading loco's DJ remains closed.

Real Precautions for Manual Notching (GR)

When MP and EEC fail, manual GR control may be used ONLY to clear the section. Real precautions: 1) Remove GR manual handle by rotating 90° first — cuts air supply to GR mechanism. 2) Q44 relay must NOT be wedged during manual GR operation. 3) One GR handle rotation must complete within real 0.6 seconds — longer causes DJ tripping. 4) Watch HT compartment, particularly RGR, closely. 5) Increase/decrease notches per LP's advice, restricted speed to stop anywhere as needed. 6) Once section cleared, report MP/EEC failure to TLC/PCOR — manual GR is a clearing measure only, not normal operating mode.

Real Safety Fittings Checklist (Crew-Level)

Real Air-Pressure/Vacuum Leak Test (WAG5 Air-Brake Loco)

Real Caution-Order Time-Loss Table

Calculated for mail/express/passenger trains only (T.P. = telegraph post; real note: one T.P. spacing is taken as one OHE-span length).

Real ScenarioReal Time Loss Allowed
De-acceleration for out-of-course stop on main line1 minute
Acceleration to booked speed after out-of-course stop on main line2 minutes
Stop dead & proceed with 8 km/h over 1 T.P. (+30 sec/extra T.P.)6 minutes
8-10 km/h restriction over 1 T.P. (+25 sec/extra T.P.)5 minutes
15 km/h restriction over 1 T.P. (+15 sec/extra T.P.)4 minutes
30 km/h restriction over 1 T.P. (+8 sec/extra T.P.)3 minutes
50 km/h restriction over 1 T.P. (+5 sec/extra T.P.)1 minute
De-acceleration for out-of-course halt in loop line3.5 minutes
Acceleration from loop line3.5 minutes
Passing through loop line at 15 km/h7 minutes
Passing through loop line at 8 km/h12 minutes
🎯
Exam Focus — Real Worked Example: Caution-Order Time Loss
For a 30 km/h speed restriction over a distance equal to 5 OHE-mast spans: time loss for the first span = 3 minutes (base 30 km/h rate). Remaining 4 spans at 15 sec/span = 15×4 = 60 sec = 1 minute. Total time loss = 3 + 1 = 4 minutes.

Real Checks While Taking Over MU/Single Loco in Trip Shed

Real 10-item multiple-loco checklist: 1) Check leading/trailing loco cock positions, correct if wrong. 2) Check A9/SA9 apply/release, no C2 relay-valve leakage. 3) Check multiple-jumper electrical connections properly fixed. 4) MR pressure real 8.0-9.5 kg/cm², BP real 5 kg/cm² achieved easily; vacuum with both PVs. 5) BLSN switch operation — rear loco pantograph raises/lowers correctly. 6) Trip trailing loco's DJ — confirm real pilot lamps glow: LSOL, LSDJ, LSCHBA, LSGR, LSB. 7) Open leading loco's DJ, both DJs trip without difficulty. 8) Traction test — 2-3 notches in leading loco with brakes applied, trailing loco's notch position matches, both return to 0 together. 9) Brake-power test (same as single loco). 10) Check all safety fittings. Real note: single-loco checklist is the same MINUS the BLSN check and trailing-loco notch verification.

Real Stalling-Avoidance Techniques

Real Advanced Troubleshooting Checklists (Inspectors/Supervisors)

Real 6 most-common loco-trouble scenarios, each with detailed checks to try before failing the locomotive and sending it to homing shed.

Real Combined Train Report (CTR)

CTR (formerly the guard's journal) has 2 real parts: Part I (LP), Part II (guard). Real 9 data points: train name/number+crew; train load; engine number; intersectional running time; time loss/gain by account; lube/fuel-oil consumption (diesel); engine-hours utilisation; crew duty hours (sign-on/sign-off); signal/track defects noticed.

Real filling procedure: guard collects 4 real CTR forms at sign-on, fills Part II in quadruplicate; at journey end, guard hands 3 copies to LP after verifying timings; LP fills Part I in all 4 copies; LP submits 3 copies to HQ depot — real distribution: 1 to statistical branch, 1 retained by depot in-charge, 1 to loco running bill section. CTR is also the basic record for mileage-allowance payment.

Real Portable Field Telephone Management

Real 2 types: (1) Field-telephone-socket telephone — dry-cell operated with flexible wire/pin, real sockets beside the OHE mast every half kilometre, with an arrow mark pointing to the nearest socket. (2) Portable mobile telephone — no socket/pin needed, periodically recharged, usable anywhere in section.

Real 3 issue systems compared: (1) as a loco item (issued by homing shed, minimal requirement but real loss risk on foreign railways); (2) issued to LPs at sign-on (real 10-column register, better accountability but real requirement at least twice the loco-item requirement, handling needed at every crew-change point); (3) as the LP's personal store (avoids per-trip record-keeping, but real constraint of ~100 LPs signing on/off daily and reduced line-box sizes making storage difficult). Real conclusion: system (2) — issue at sign-on — is judged the more practical/workable option. Real testing note: S&T branch tests each phone periodically, next-due-date painted on the phone; lobby in-charge maintains a testing-due register; defective phones are replaced by the engine turner.

Real Working Time Table (WTT) — Loco-Operation Relevant Content

The WTT is issued by COM of the zonal railway for each division every real 6 months. Real goods-train information: permissible load in tonnes per section per engine type; banking-engine requirement; stopping restrictions at particular stations/signals for fully-loaded goods trains; goods train-load reduction during monsoon; permanent speed restrictions from continuous falling gradient/various operating conditions; inter-sectional running time. Real rolling-stock information: max. permissible speed per engine type and per roller-bearing/ball-bearing wagons/coaches. Real passenger-train information: intersectional running timing; booked and max. permissible speed of each passenger-carrying train; normal and minimum running time, indicating engineering/loco/traffic time gain available.

Real Loco Brakes Not Releasing (WAM4-Specific)

Real 3 pneumatic-circuit causes: (i) defect in LP's automatic brake (DAB); (ii) B2 relay valve defective; (iii) brake-cylinder spring broken.

← All Electrical Engineering chapters