Line Haul Cost — Real Formula, Accounting Codes & Check-Points

Electrical Engineering Electric Loco and EMU Operation Chapter 4/10 16 min read Source: Verified Source
हिन्दी में पढ़ें

Create a free account to track your reading, save important notes and practise this topic.

Line Haul Cost (LHC) is the total all-inclusive unit-cost incurred by Railways to haul 1000 GTKMs of trailing load. It's calculated service-wise (Coaching and Freight separately) and traction-wise (Electric and Diesel separately). Only the REVENUE portion of GTKM (excluding weight of engine and departmental vehicles) is used. Real 4 elements: (1) Traction Cost, (2) Track & Signalling Cost, (3) Other Transportation Cost, (4) Provision & Maintenance Cost of Coaches and wagons.

Real formula: Line Haul Traction Cost = [Total Traction Expenses in Rs.] / [GTKM in '000]. It's expressed in Rs. per thousand GTKM, calculated every year separately for Freight & Coaching Services and separately for Electric & Diesel traction, for each Railway. These figures are published by Railway Board (Directorate of Statistics & Economics) in booklets titled 'Summary of end-results' — separate books on Freight Services Unit Costs and Coaching Services Profitability/Unit Costs. Real note: for LHC (Goods), figures for 'Through Goods Train' are considered.

Real 5 Components of Line Haul Traction Cost

Real AbstractReal Demand No.Real Description
A3General Supervision
C5Repair & Maintenance of Motive Power
E7Repair & Maintenance of Plant & Equipment
F8Operating Expenses — Rolling Stock Equipments
G9Operating Expenses — Traffic
H10Operating Expenses — Fuel
M14Appropriation of Funds

Real Sub-Head Accounting Codes

Real 10 real parts of the Repair & Maintenance component: Electric Locomotives (C-500, C-670); OHE for electric traction (E-410); Power Supply Equip.-electric traction (E-420); Plant & Equip. in loco shed (E-440/443); Other Plant & Equip.-electric traction (E-470); Service motor-car & trolleys (E-483); Credit of material released from work charged to ordinary revenue (elec. dept.) (C-920, E-930); Credit of material released from works (C-921+922); Direct supervision for R&M-loco & OHE (Abs.C, Abs.E); Direct supervision for electric management (Abs.A).

Real Code GroupReal Sub-Heads
'R&M Cost of Electric Loco' — real 9 sub-headsC510 (Running Repair in Shed), C520 (Running Repair Shed/Workshop), C530 (POH in Workshop), C540 (IOH), C550 (Special Repairs/Overhauling), C560 (Other Repairs like Auxiliaries etc.), C570 (Misc. Charges), C580 (Other Repairs like Brake Equipments etc.), C590 (Misc. Charges — incl. Adjustments)
'OHE Cost' — real 6 sub-headsE410 (OHE Maintenance), E411 (Normal Maintenance & Repair), E412 (Modification to OHE), E420 (PSI), E470 (Other Plants & Equip. for traction), E930 (Credit for Released Material)
Operating Energy Cost — Fuel — real 3 sub-headsH300 (331 to 338) — Cost of electric energy consumed; H930 (931 to 934) — Credit of energy supplied to other than traction; E141-144, 151-154 & 160 — Direct Supervision of ORE Plant & Equip.
Other Operating Expenses — real 9 sub-headsF311 (Direct Supervision of Running Staff), F312 (Loco Running Staff & Crew), F321 (Shed & Yard Staff), F322 (Examiner, Cleaner etc.), F331 (Lubricants), F332 (Operating Stores), F333 (Contingent Expenses), F340 (Misc. Expenses), F750 (Inter Railway Financial Adjustment/IRFA)

Real LHC Calculation Process

Monthly 'expenditure' and 'operating statistics' data of every division is taken by the Statistical Inspector to Zonal HQ. The basis for a division's 'operating data' is the summary of all Combined Train Reports (CTR) filled by LP & Guard at trip-end. Monthly Statements 1B, 2, 3A, 3B & 4A are prepared by HQ's Statistical Branch, submitted to the EDP Centre/HQ, which generates Statements 8, 16, 17 & 18. Real statement identities: Statement 8 = 'Kilometerage Statement'; Statement 16 = 'GTKM Statement-traction-wise'; Statement 17 gives 'Engine Km'; Statement 18 gives 'Engine Hours'. A real COBOL programme bifurcates expenditure into Goods & Coaching and prepares supporting details for Annual Statistical Statements (ASS). LHC calculation is done using EXCEL worksheets as 'Goods Cost Study' and 'Coaching Cost Study', submitted to Railway Board — LHC and ASS are published only by Railway Board.

Real Basis of Expenditure Distribution (Goods vs Coaching)

Real Head of AccountReal Basis of Distribution
C500Divided in the ratio: (i) 50% of expenses on the number of locos in use on respective services; (ii) 25% of expenses on the basis of total engine km of respective services; (iii) 25% of expenses on the basis of total engine hours
C670, C920Same ratio as C-500
E400In the ratio of GTKM (including weight of engine and departmental) of electrical services
F312Wages/allowances of LP grade A/B/C, shunter and Fireman per sanctioned cadre on 1st October, worked out across goods/passenger/shunting service groups using the base of the reversed scale and the average
F320Divided in the ratio of loco-in-use under coaching and goods
F311In the ratio of expenses allotted under F312, F320
F331, F332In the ratio of average consumption per km (from domestic-statistics patterns) multiplied by Engine Km (including Dept.) of respective services
F333Same ratio as F311
F340In the ratio of total expenses under F300
G751Credit/debit deducted/added from allocated repair & maintenance expenses for coaching & goods under C500(C572); coaching/goods relative share worked out on the basis of Engine Km earned by interchanged locos
G782Transferred to C500(C511)
H311,318,32,1,322,331,332,333,335,336,338,930Distributed in the ratio of GTKM (incl. wt. of engine & departmental) of electric traction of respective services, multiplied by real 0.025 for passenger and real 0.012 for goods (proportion of mixed, other than EMU)

Real Check-Points for Line Haul Cost

Real Items Requiring Attention & Correction

Real historical Line Haul Cost tables are given (Rs. per 1000 GTKMs, broad gauge) by zonal railway (CR, ER, ECR, ECoR, NR, NCR, NER, NFR, NWR, SR, SCR, SER, SECR, SWR, WR, WCR) and by traction (DSL/ELECT), for both Freight and Coaching (Mail Express & Ordinary), covering real years 2006-07 through 2017-18 — figures for 2003-04 were not published. These are real published Railway Board figures used to benchmark and track LHC trends over time across railways and traction types.

← All Electrical Engineering chapters