Long Haul Train — Real Operating Rules & Technical Requirements

Electrical Engineering Electric Loco and EMU Operation Chapter 5/10 14 min read Source: Verified Source
हिन्दी में पढ़ें

Create a free account to track your reading, save important notes and practise this topic.

A Long Haul (LH) train is a composition of more than one standard train formation — the constituent trains may be empty or loaded. Running LH trains reduces congestion in busy sections (increasing throughput) and increases rolling-stock speed by reducing the number of trains. Real rule: LH rakes may only be formed at NOTIFIED stations with TXR presence; if a point has no TXR, one must be arranged there. The train may be split at any station, with adequate precautions, for precedence-crossing of passenger trains or in exceptional circumstances.

Real Front LoadReal Rear Load
Empty TrainEmpty Train
Loaded TrainLoaded Train
Loaded TrainEmpty Train

Real General Requirements for Long Haul Trains

Real Technical Requirements — Locomotive

Real LocomotiveReal BPReal PoweringReal BrakingReal Emergency Braking
Leading Loco(s)YesYesYesYes
Middle Loco(s)NoYes/No #NoYes

Real note: '#' means powering of the middle loco may be selected based on the load hauled. This is the real table for LH loco operation WITHOUT use of a distributed power system.

Real Loco Crew Rules

Real Technical Requirements — C&W (Carriage & Wagon)

Real Communication Requirements

Real Operating (Traffic) Rules

Real Other Important Instructions

Real Long-Term Strategy & Twin-Pipe Introduction

For operation of loaded LH trains HEAVIER than real 9000 tonnes and at a speed above real 60 km/h, RDSO must conduct field trials with different classes of locos to determine EBD (Emergency Brake Distance) before permitting such operation.

Real twin-pipe introduction plan: can be started from BCNHL, BOXNHL & BLC type wagons to begin with, and later adopted on all BOXN-type and BCN-type wagons. The single-pipe system has real problems of BP pressure fading and propagation delays in brake application/release — in emergency braking, release was seen to take longer than real 950 seconds in the initial trial. This would become a limitation on unrestricted LH adoption. Real timeline: BCN, BOXN & Flat wagons and loco should be converted to twin pipe within the next 5 years.

← All Electrical Engineering chapters