OHE Special Checks & Seasonal (Pre-Summer/Pre-Monsoon) Maintenance

Electrical Engineering Traction Distribution Chapter 12/87 12 min read Source: Verified Source
हिन्दी में पढ़ें

Create a free account to track your reading, save important notes and practise this topic.

Most OHE items are attended to during annual maintenance and periodical overhaul. Some items, however, require more frequent attention — this chapter covers those special, higher-frequency checks, plus the two dedicated seasonal (pre-summer, pre-monsoon) checklists.

5.1 Insulators — Cleaning Frequency by Pollution Level

5.2 Section Insulator — Quarterly

Section insulators on main lines, neutral sections, passenger yards, and sidings should be attended to ONCE IN THREE MONTHS as follows:

  1. Clean insulators and replace badly chipped or even slightly cracked insulators.
  2. Check runners for flash marks.
  3. Check level of the assembly and adjust as required.
  4. Check for excessive contact wire wear near the anchor clamp.
  5. Tighten the PG clamps of droppers and stiffener properly.
  6. Check that the pantograph passes underneath the section insulator smoothly.

5.3-5.7 Other Special Checks

5.8 Pre-Summer Checks

ItemCheck
Overhead crossingCheck all power line crossings for broken and loose guard wire
Bird nest / kite threadsRemove all kite threads and polythene from OHE, transmission line, and nearby structures (FOB/ROB/platform sheds etc.)
ATDsEnsure free movement of ATDs; replace jammed/over-riding ATDs. Proper Z & Y adjustment should be done
JumperExcessive loose jumpers should be attended
Anti-creepAnti-creep having excess sag should be re-tensioned
Turnout/CrossoverAll turnouts and crossovers should be checked
FOB/ROBClearance of the OHE under FOB/ROB should be checked; protective screen, cable/wires should be properly secured

5.9 Pre-Monsoon Checks

  1. Check the condition of insulators, especially section insulators at major yards having mixed type of traction.
  2. Check the overline structure for any water leakage onto the OHE.
  3. Trim tree branches near the OHE.
  4. Check the condition of embankments with respect to stability of the mast.
  5. Ensure proper drainage of rainwater surrounding the OHE foundation/mast.
🎯
Exam Focus — The Frequency Ladder for Section 5
A clean frequency ladder across Section 5's special checks: isolating switch earth continuity = MONTHLY (most frequent) → section insulator, bi-metallic clamps = QUARTERLY (3-monthly) → earth connections (bond/earthing soundness specifically) = HALF-YEARLY (6-monthly) → insulator cleaning = YEARLY in unpolluted areas (with quarterly-or-more in heavy pollution zones, since pollution overrides the default). Pre-summer and pre-monsoon checks are seasonal (twice-yearly, timed to the season) rather than fixed-interval — a distinct category from the calendar-based frequencies above.