Traction substations step down incoming EHV supply (220/132/110/166 kV) to 25kV for feeding OHE, using traction transformers most commonly rated 13.5 MVA (ONAN) or 10.8 MVA (ONAN) — though the real RDSO reference schematic (Drg. No. ETI/PSI/702) shows figures like 132/25kV, 13.5/21.16 MVA in practice.
Voltage Regulation — Real Limits
25kV Supply at Traction Substations
- On the secondary side: one transformer circuit breaker and one feeder circuit breaker, with associated double-pole isolators, arranged so full operational flexibility is ensured.
- The traction substation is designed for REMOTE operation, with feeder change-over facility via isolator/bus coupler.
- One end of the transformer's secondary winding is solidly earthed at the substation, connected to track/return feeder through the buried rail.
Feeding & Sectioning Arrangements
Since single-phase traction load causes unbalance on the Supply Authority's 3-phase system, power for adjacent substations is tapped off across DIFFERENT phases of the grid in cyclic order — which is exactly why a Neutral Section must exist between substations, ensuring a pantograph never bridges two different phases.
| Voltage Unbalance Type | Permissible Limit |
|---|---|
| Instantaneous | 5% |
| 2 hours | 3% |
| Continuous | 2% |
Sectioning Structure — Real Definitions
- OHE is sectioned at intervals of 10 to 15 km along the route for rapid fault isolation and maintenance — at each such point, switching station interruptors (usually rated 600A) are provided.
- The shortest section isolable by opening interruptors alone is called a 'sub-sector.' Each sub-sector further divides into smaller 'elementary sections' via off-load manually-operated isolator switches.
- Feeding Post (FP): each feeder supplies OHE on one side through interruptors controlling individual lines — a two-track line has FOUR interruptors at each Feeding Post.
- Sectioning & Paralleling Post (SP): situated roughly midway between Feeding Posts, marking the demarcation between zones fed from different substation phases — this is where the Neutral Section actually sits.
Power Supply for Signalling
To ensure reliable 240V AC for signalling, a 25kV/240V auxiliary transformer (tapping the 25kV OHE) is provided at: every wayside station (for CLS), level crossings more than 2km from a railway station, at IBH (Intermediate Block Huts), and at all power supply installations. If power block affects both OHE sub-sectors feeding the signal supply, colour-light signals go out of operation — but since this is rare and typically under an hour, no additional Electrical Department arrangement is made; instead, S&T keeps portable generator sets ready, with standby diesel generators at large stations with heavy shunting.
Since traction load fluctuation affects the 240V signalling supply, S&T provides static-type voltage regulators to limit voltage fluctuations to ±5% — installed in separate kiosks, inside the remote control cubicle, ASM's room, or cabins depending on load-centre position.