Maintenance Schedule
- Monthly: visual inspection for overheating signs at connecting points; clean insulator with dry cloth, check flash marks/chipping/surface cracks; record surge counter discharges (if provided); record leakage current value (if provided).
- Quarterly (additional): check/tighten main and earth connections; check/tighten grading rings if applicable.
- Half-Yearly (additional): measure leakage current and record, if a leakage current monitor is provided, per spec TI/SPC/PSI/LCMLA/0030.
| Yearly Test | Standard Value |
|---|---|
| IR value of each LA unit (2.5/5kV megger) — for 42kV LA | More than 1 GΩ |
| IR value of each LA unit — for LA on HV side | More than 10 GΩ |
| Earth resistance of earth connection | Not more than 0.5 Ω |
Yearly records for each LA must include: location, rating, make, serial no., date of manufacture, date of commissioning, date of measurement, IR value, THRC value of leakage current, total leakage current, number of surges passed, and remarks.
Pre-Monsoon Check: before monsoon onset, ensure no scheduled maintenance is overdue for LA. Additionally ensure: proper cleaning of all arresters; IR value of each unit POSITIVELY checked (to avoid bursting/failure); all connections tight; leakage current monitor reading checked (if provided); surge counter reading checked (if provided).
Failure, Causes & Remedial Action — 5 Real Documented Failure Modes
From a seminar on LA maintenance (23rd-24th August), the following common failures were documented, each with a genuine root cause and a real, escalating remedial procedure.
| Failure | Cause |
|---|---|
| Low insulation resistance value | Ingress of moisture inside LA; ageing of zinc oxide blocks |
| LA burst or punctured | Heavy rain and thundering |
| Hair cracks on porcelain portion | Hitting by foreign body; manufacturing defect |
| Hot spot on top connector | Loose connection |
| Top diaphragm burst | Manufacturing defect |
The general remedial pattern across all 5 failure modes: (1) disconnect and unload the LA from line carefully; (2) if the LA is a single unit, check IR of a spare unit — if within permissible limit, replace the defective LA entirely; (3) if the LA has multiple units, identify and remove just the defective unit, replacing it with a healthy unit of the SAME MAKE (never mix makes); (4) check IR of the fully re-assembled LA — must be within/more than permissible limit; (5) re-erect, re-take IR value, reconnect all connections, and commission. The 'Hot Spot on Top Connector' failure has an extra first-response step before this pattern: if the connection is merely loose, simply TIGHTEN it and replace overheated nuts/bolts — only escalate to unit replacement if the connector plate is badly overheated/damaged beyond simple repair.
DOs and DON'Ts
- DO: before maintenance/inspection/replacement, take a shutdown, earth the concerned circuit, and disconnect the arrester from the line end as a safety precaution.
- DO: keep vent ports away from transformers/other equipment when erecting, to prevent damage in case of arrester failure.
- DO: always ensure the ground connection is firmly made BEFORE connecting the arrester to an energized line. If a discharge counter is used, it must be connected before the arrester connects to an energized line.
- DO: in multi-unit arresters, use SAME-MAKE units only.
- DON'T: never work on an arrester without a shutdown in the concerned circuit.
- DON'T: staff should NOT climb the arrester during maintenance/installation — this may break the porcelain.
- DON'T: never install a chipped or cracked porcelain housing.
- DON'T: never lift by the line terminal — use rope around the housing instead; never tilt during handling (upright only).
- DON'T: if abnormal sound (suggesting broken internal components) is heard from any arrester, that arrester must NOT be used.
- DON'T: never mix different makes in a multi-unit arrester; never use the arrester as a bus support.
- DON'T: the earth terminal of the arrester must NEVER be isolated — when removing a surge monitor, the disconnection must be BY-PASSED WITH AN EARTHING SHUNT.
Condition Monitoring by LCM III
In normal service, a metal oxide surge arrester (MOSA) carries a continuous but small leakage current, typically 0.1-2 mA — dominated by a CAPACITIVE component, with the RESISTIVE component only 5-25% of the capacitive one. MOSAs normally operate at a continuous voltage of 60-80% of rated voltage. Because ZnO's non-linear characteristic makes even a large increase in resistive leakage current (Ir) barely noticeable within the total leakage current, measuring the 3rd harmonic resistive component specifically — via LCM III — is the best way to obtain sensitive, reliable information about arrester health without any shutdown.
LCM III — Principle & Five Named Accessories
Principle: the non-linear resistance of ZnO blocks introduces a 3rd harmonic resistive component in the leakage current when stressed by a sinusoidal voltage — this component best indicates changes in the arrester's non-linear characteristics over time. Since harmonic content in the operating voltage itself also increases harmonic content in the leakage current, the measurement must COMPENSATE for system-voltage harmonics, or an apparent increase in resistive current could be a false signal rather than a genuinely faulty arrester.
- Leakage Current Transformer (LCT): connected across the earthing strip of the LA to measure TOTAL leakage current flowing through it.
- Dish Antenna Probe (DAP): placed at the base of the LA to pick up harmonics in the SYSTEM VOLTAGE, giving the capacitive component of leakage current.
- Telescopic Hot Stick (THS): used to place the DAP at the base of the LA (from a safe distance, live).
- Signal Conditioning & Measuring Unit (SCU): takes signals from LCT and DAP as inputs, determines the resistive component of leakage current.
- Signal Processing & Data Management Unit (SPU): data management system with self-test/signal simulation, stores per-LA information (network-wide), saves leakage current values over time, and displays leakage-current waveforms WITHOUT needing an external oscilloscope.
How to Use LCM III — 4-Step Procedure
- Connect the LCT across the earthing strip of the LA, to measure total leakage current.
- Place the DAP, using the THS, at the base of the LA — to pick up system-voltage harmonics, giving the capacitive current component.
- Connect the SCU with leads from the LCT and DAP, to determine the resistive component of leakage current.
- Connect the SCU and SPU — leakage-current waveforms of the various components can be viewed directly in the SPU without an external oscilloscope.
Measured Parameters (5 Display Fields)
| Field | Meaning |
|---|---|
| It (mA) | Peak value of TOTAL leakage current |
| Ic (mA) | Peak value of the CAPACITIVE current |
| I3t (mA) | Third-order harmonic current measured |
| Ir (mA) | Resistive current of the LA — UNCORRECTED value, must be corrected for voltage/temperature variations |
| Ir (corr) | CORRECTED resistive current, referenced to 70% rated voltage and 20°C |
LCM applications: as a portable instrument for regular condition checks; to monitor an arrester over a shorter/longer period (e.g. investigating unexpectedly high leakage current in more detail); or permanently installed for continuous registration at substations of major importance. Recommendation: the first resistive-leakage-current measurement should be taken shortly AFTER installation, as the best reference 'fingerprint' for all future comparisons. Ageing typically causes a GRADUAL increase in leakage current over time — establishing regular measurement procedures allows detecting aged arresters and removing them from service BEFORE failure.