Power Transformer — Monthly Schedule
- Maximum temperature of transformer oil AND winding on dial indicator: check, compare with previous values, investigate abnormal change, and reset indicator.
- Oil level in conservator (MOLG): check per the Oil Temperature Indicator (OTI); top up with filtered oil if low.
- Buchholz Relay: check for gas collection — if gas collected, send for DGA per RDSO guideline (Annex 2.04 of ACTM Vol II, Part I).
- Oil level in OIP condenser bushing: check via oil level indicator. If sealed bushing shows less-than-minimum oil, measure Tan Delta and capacitance and compare with earlier values — MAX ALLOWABLE Tan Delta is 0.007, capacitance limit is 110% of the factory-set value.
- Tap changer: check/record position of standby and service transformer.
- Tank, radiators, conservator, bushing, oil level indicator, gauges: check/clean dirt, leakage, cracks — attend if crack/leakage observed.
- Dehydrating breather: check for choking (insect build-up/dirt); check gasket intactness and silica gel colour — if silica gel is pink, replace with new gasket and dry silica gel (or recondition). If silica gel is too wet, check BDV of transformer oil — IF BDV IS LESS THAN 50kV, FILTER THE OIL TILL IT REACHES 50kV. Check/top up oil in the breather oil cup.
- Heater in marshalling box: check for proper functioning — check and rectify connection if not working.
- Sound: check for abnormal humming, find the reason if observed.
- All external connections: check visually for normal condition without discoloration from local heating — clean and tighten bolts/nuts if any heating sign.
Power Transformer — Half-Yearly Additions
- Test oil sample with oil test kit for BDV and acidity — compare and act per Annexure I.
- PRD/explosion vent: check for damage and presence of oil; check connection and operation — replace damaged PRD with new one.
Insulation Resistance & Polarization Index (PI) — The Key Half-Yearly Test
Insulation resistance is measured for 10 seconds, 60 seconds, and 600 seconds for HV-LV, HV-E, and LV-E, using a 2.5kV or 5kV megger — with the transformer disconnected and bushings clean/free from moisture, and temperature at which IR is recorded also noted. PI (Polarization Index) is calculated as the ratio R60/R10, and also R600/R60. IR values are compared with the last recorded value.
| PI Value | Insulation Condition |
|---|---|
| < 1.0 | Dangerous |
| 1.0 - 1.1 | Poor |
| 1.1 - 1.25 | Questionable |
| 1.25 - 2.0 | Satisfactory |
| > 2.0 | Good |
Power Transformer — Yearly Additions
- Infrared temperature scanning of tank, bushings, tap changer, radiator, and connection joints — preferably at full load, compared with previous scan results.
- OIP condenser bushing: Tan Delta, capacitance, and IR measured/compared (Schering bridge may be used) — bushing must be cleaned of dust/moisture, and test done on a SUNNY DAY. Max allowable Tan Delta 0.007, max capacitance 110%.
- Test oil per IS-1866-2000 (Annexure I / ACTM Vol II Part-I, Annexure 2.03B) — replace oil if it doesn't meet requirements.
- Dissolved Gas Analysis (DGA) per RDSO guideline (Annexure 2.04, ACTM Vol II Part I) — compare with guideline; IF DGA VALUES SHOW PAST ABNORMALITY, DGA TEST FREQUENCY INCREASES TO EVERY SIX MONTHS.
- Working of tap changer switch: move up/down full range for self-wiping action to ensure good contacts; set the tap finally at the correct position.
- Buchholz relay: check operation, measure IR by 500V megger (should be NOT LESS THAN 20 MEGA OHM), and continuity test for contacts with test lock screw set at 5° — relay must operate on continuity test.
- Voltage ratio test with Wheatstone bridge/voltmeter: compare trends with pre-commissioning/factory/earlier values — a SUDDEN variation from the last measured value calls for further investigation.
- Winding resistance test with Wheatstone bridge voltmeter-ammeter (DC current, on principal tap; measured value converted to 75°C) — this test should be done LAST among winding tests, to avoid residual DC flux affecting other test results. Deviation from pre-commissioning/factory value should be LESS THAN ±5%.
Auxiliary Transformer — Monthly, Quarterly, Half-Yearly, Yearly
- Monthly: visual inspection for oil leakage/overheating; clean externally; check silica gel colour (replace/reactivate if pink) and top up breather oil cup; check/clean/tighten HT and LT bushing terminal connections; top up oil in conservator with new filtered oil (BDV must be more than 30kV); clean AT enclosure of vegetation; check pole-mounted ICDP switch/control panel/fuses (fuse wire: 20 SWG for 34A, 22 SWG for 24A); check caution board and anti-climbing device availability; check/tighten earthing connections; check arcing horn on HV bushing for flashover marks.
- Quarterly (additional): check condition of Drop-Out (DO) fuse barrel/element, replace breakage/overheating/non-standard fuse wire with STANDARD fuse wire; check for any unusual sound (equipment should be soundless).
- Half-Yearly (additional): BDV of oil (sample from bottom of tank, 2.5mm spindle gap) MORE THAN 30kV; measure additional arcing horn gap on fixed 9-ton insulator — MINIMUM 165mm, record; measure insulation resistance HV-Earth ≥200MΩ (2.5kV megger), HV-LV ≥200MΩ (2.5kV megger), LV-Earth ≥2MΩ (500V megger); measure earth resistance — NOT MORE THAN 10 OHMS; measure IR value of LT cable (AT to ICDP switch, ICDP switch to control panel) ≥2MΩ at 30°C (500V megger).
- Yearly (additional): winding continuity on all tappings (multimeter/500V megger) — should be ZERO; check smooth operation of tap changer on all tappings (no obstruction); check oil acidity — MAXIMUM 0.5 mg KOH/gm; ratio test (apply AC to HV winding, measure LV voltage, compare with previous reading); check HT/LT jumpers and lugs for looseness/flash marks — replace if found; painting (if faded/rusted) with epoxy and polyurethane paints per RDSO spec ETI/PSI/118 (A&C slip no.8); replace DO fuse wire with new one.
Periodic Overhaul (POH) — Power Transformer
The procedure applies to bell-type tank construction transformers. POH can be done at site (TSS), in the traction repair shop, or through trade. The transformer must NOT be opened during rainy/cloudy weather for inspection/repair/overhaul.
Tests BEFORE Undertaking POH
- Measure dielectric strength (BDV), acidity, water content (ppm), and Tan Delta of transformer oil.
- Dissolved Gas Analysis (DGA) of transformer oil.
- Measurement of winding resistance on all taps.
- Measure insulation resistance of winding and Polarization Index.
- Measurement of Tan Delta and capacitance of condenser bushing.
All these pre-POH values are recorded and compared with values recorded AFTER completion of overhauling.
Steps for Overhauling
Untanking: drain out oil, disconnect all leads, remove manhole covers/accessories/conservator/breather/radiator/fittings/HV/LV bushings and store safely. One set of standard-quality gaskets must be available for replacement (per Annexure IX). The bell tank is removed by suitable crane/winch, carefully to avoid damaging active parts. Defects observed during inspection are recorded, and issues like tank/conservator/radiator leakage are permanently rectified during POH.
Drying-Out/Filtration: vacuum drying is done per IS 1866:2000, MAINTAINING PRESSURE LESS THAN 0.10 TORR and MAXIMUM TEMPERATURE OF 60°C. During filtration/drying, temperature and IR value readings are recorded EVERY TWO HOURS from commencement till full operation is completed (per ACTM Vol II Part I, para 20208/20210). To confirm moisture removal, PI after drying should preferably be EQUAL TO OR MORE THAN 2.
- Items checked/attended during overhauling: insulating oil, windings and internal parts, conservator/radiators/metal parts and pipes, drain/oil-sampling/filter valves, insulation blocks/permali wood packing/spacers/wedge/keyed blocks (checked for displacement from repeated short-circuit stress), pressure screws with belleville washers, top/bottom yoke bolts (ferrule insulation dielectric strength tested by 2kV AC for 1 minute), electrical joints/earth connections/tap changer lead connections, active-part-to-tank clearances, off-circuit tap changer contacts and operation, all fastener/core bolt tightness, condenser bushing oil level/cracks/leakage, and control cables.
- PRECAUTION: tools/objects (spanners, washers, cloth pieces) left inside a transformer present a short-circuit hazard — tools must be listed at the START of work and accounted for at the END.
Checks/Tests AFTER Overhauling
- Voltage ratio test (voltmeter/ammeter/lamp or ratio meter).
- Winding resistance test (Wheatstone bridge or voltmeter-ammeter method).
- Magnetizing current test (voltmeter, ammeter, lamp).
- IR of windings and Polarization Index with a motorised 5kV megger.
- Transformer oil tests: BDV, ppm, Tan Delta, acidity.
- Check protection equipment (Buchholz, PRD, MOLG, WTI, OTI) for proper working.
- Check all gasket joints for leakage; check relay/alarm contacts for operation.
- Check control/terminal boxes for water-tightness (replace gasket if required); check dial-type OTI/WTI for pointer freedom.
- Check IR value and secondary winding resistance of bushing CTs.
- Bushing Tan Delta/capacitance test — compare with prior values; MAX ALLOWABLE Tan Delta 0.007, capacitance 110% of factory-set value.
- Check Tap Changer (TC) operates correctly in Manual, Local (electrical), and Remote electrical modes.
- Check oil level in tank/conservator/condenser bushing/TC; check OTI/WTI pockets and breather oil cup, replenish oil; check arcing horn gap per drawing.
- Check all earthing connections per diagram plate; check air delivery cooler fans work in right direction (where provided).
- Ensure silica gel is active and blue, oil is at correct level in cup; check thermometer oil pockets are filled properly.
- Remove/clear all tools and equipment used in POH from the transformer; lock the roller to prevent rail movement; release trapped air through air release plugs/valves.
Commissioning after POH follows ACTM Vol II Part I, para 20905/20906/20907. Performance is evaluated by comparing post-POH insulation resistance/PI and oil BDV/water content/Tan Delta/acidity/DGA values against pre-POH readings — all kept on record for ongoing performance monitoring.
Items Requiring Replacement WITHOUT FAIL During POH
- Insulating oil.
- Gasket and rubber items (per Annexure IX).
- Pre-compressed board used to insulate the bottom of the tank from active parts.
- Silica gel.
Other items (insulation material like permali wood packing, coil clamping screws/plates, radial paper covered insulation, fibre glass ferrule, and winding items like locking/plain spacers, keyed blocks, core packing, clamping rings, plus cable clamps/glands/lugs, relays/switches, and tap-changer parts like the Bakelite phase board, brass slip rings, copper brush assembly, gears/bearings, and connection cables) are replaced ON A CONDITION BASIS — only if found defective/worn, not automatically like the four items above.
Periodic Overhaul — Auxiliary Transformer
AT POH can be done in the repair shop or through trade. General cleaning first (remove dirt around tank/radiator/HV & LV bushing/neutral link block covers; blow dust off with compressed air), then a full visual inspection (tank deformation/cracks, bushing cracks/chipped discs, silica gel condition, oil leakage points, valve thread condition, gaskets, conservator/oil-level glass, arcing horn condition) with all defects noted.
- Tests BEFORE opening the transformer: insulation resistance (HV-Earth by 2.5kV megger, LV-Earth by 500V megger, HV-LV by 2.5kV megger); continuity test of primary/secondary windings (multimeter); tap changer condition/operation at all tap positions; BDV of oil (automatic BDV kit); Polarization ratio (2500V DC applied continuously, IR noted at 10 sec and 60 sec); DGA of oil; further oil tests (specific resistance/resistivity, water content, Tan Delta, flash point, neutralization value, sludge); ratio test.
- Before the physical work: drain oil, disconnect all leads, remove tank top cover/accessories/conservator/fittings, disconnect HV & LV bushings (store safely), disconnect earth leads from the primary earth bushing terminal link block, disconnect power cable connections from the secondary winding bushing.
- AFTER opening: measure insulation resistance of winding; check all core support bolts for cracks (replace if required); check condition of core/winding/lamination; check for water content/sludge accumulation inside the tank; check earth connections; check condition of soldered joints; check insulation paper for damage (re-insulate if necessary); check condition of tap changer contact tips at all tap positions.