Quarterly & Half-Yearly Maintenance

Electrical Engineering Traction Distribution Chapter 67/87 13 min read Source: Verified Source
हिन्दी में पढ़ें

Create a free account to track your reading, save important notes and practise this topic.

As maintenance periodicity extends from monthly to quarterly to half-yearly, the checks become progressively deeper and more instrumented — moving from visual/hand checks to precision measurement with proper test equipment.

Quarterly Maintenance

Batteries — Full Individual Cell Check
  • Unlike the fortnightly check (pilot cell only), quarterly maintenance requires taking specific gravity AND cell voltage of EVERY INDIVIDUAL CELL, entered in the register.
  • If the battery isn't fully charged, boost charging and increased trickle rate should be applied — but ONLY by a supervisory official, and only AFTER investigating the cause of excessive discharge, not as a routine top-up.

PTs, CTs & Auxiliary Transformers

🎯
Exam Focus — The Spring-Latch Fuse Test
A real, specific check for auxiliary transformers: confirm the 25kV fuse-holder drops out FREELY on raising the spring latch, check rod gap setting, and measure earth resistance of the neutral conductor — three genuinely distinct checks bundled into one quarterly item, not a single generic 'check the fuse' task.

Annual maintenance and periodical overhaul for these items follow generally the same lines as for the traction transformers themselves.

Half-Yearly Maintenance

SSE(PSI) should personally visit the grid sub-station to ascertain whether any significant change has occurred (or is expected shortly) in the EHV grid network — directly connecting to the earlier PSI Fundamentals chapter's point about needing fresh voltage readings and possible tap re-adjustment whenever grid inter-connections change.

Traction Transformers — Half-Yearly Depth
  • Test an oil sample from the TANK BOTTOM specifically for crackle test, acidity, and BDV. If BDV is below the prescribed value, the oil must be dried out.
  • Check rod-gap settings on bushings against the Maker's drawings.
  • Measure and record insulation resistance of ALL windings to earth and to each other, using a 2500V MEGGER, along with winding temperature and ambient temperature.
  • Check all alarm and trip devices for proper functioning.

Isolators — Half-Yearly Depth