Inhibited oil conforming to IS 12463 is used in traction transformers, governed by two real standards — IS-335 for new insulating oils, and IS-1866 (Code of Practice for Maintenance and Supervision of Insulating Oil in Service).
Oil Purification
Purification removes contaminants — water, carbon deposits, dirt, sludge, dissolved moisture/gases — preserving the most important quality: dielectric strength, which moisture directly affects. Insulating materials in the winding are hygroscopic by nature, absorbing moisture through defective breathers, gaskets, and untreated top-up oil. Purification is done when dielectric strength drops below permissible limits.
Oil purification plants (conforming to RDSO specification) are normally operated from 240V single-phase supply, taken from the 100kVA Station Transformer at the sub-station — the same station transformer referenced in the earlier PSI Fundamentals chapter.
Insulation Resistance During Drying Out — The 4 Real Stages
Temperature and insulation resistance readings are recorded every 2 hours from commencement until full operation completes — plotting these produces a curve with 4 genuinely distinct stages.
- Stage A: Insulation resistance initially DROPS to a low value because of rising oil temperature, up to about 75°C.
- Stage B: Resistance remains LOW despite high temperature being maintained — until most moisture from windings and oil has been driven out.
- Stage C: Resistance rises gradually and LEVELS OFF — indicating all moisture is driven out and drying is complete. Oil circulation should be discontinued AT THIS POINT.
- Stage D: As oil cools off, resistance RISES ABOVE the Stage-C levelling point — because insulation resistance DOUBLES for roughly every 10-15°C temperature drop.