This chapter covers the complete periodic maintenance schedule for 25kV AC sub-station equipment — from Fortnightly checks through to full Overhaul cycles. Two general principles apply throughout: no work of any kind may begin on or near live equipment unless power supply has been switched off and all prescribed safety measures taken, and unattended sub-stations require vigilance against unauthorized interference — the Traction Power Controller (TPC) checks each grid sub-station once a day by telephone for maximum demand/energy consumption figures, recorded in a register.

Fortnightly Maintenance

General Inspection (by SSE/JE, PSI supervisor)

Battery

  1. Check all cells for general cleanliness, electrolyte level, colour of plates, and amount of sediment, then release/report as needed.
  2. Take specific gravity and cell voltage of pilot cells and record in register. Top up with distilled water exactly to the correct level for each cell.
  3. Check operation of battery charger and note trickle charging rate in register.

Monthly Maintenance

Bonding and Earthing

Inspect all earth connections visually, ensure they are in order and every equipment has duplicate earths. Tighten connecting bolts and nuts as necessary. Check that sub-station structures are properly bonded with the feeding post earth grid and the track by two independent connections, where the sub-station and feeding post are close by.

Oil Level in Transformers, Circuit Breakers, CTs, etc.

Check oil level in sight gauge glass and examine all joints, valves, plugs, etc. for oil leakage in each equipment. Rectify leaky parts if found and restore the oil level.

Insulators

Clean insulators of transformers, circuit breakers, or interrupters with dry cloth and look for flashover marks, cracks, or chippings. Badly chipped insulators should be replaced. Minor chippings can be rendered impervious to moisture by a light coating of Araldite or similar epoxy resin.

132/25kV Traction Transformers

  1. Clean externally the tank, conservator, radiator, bushings, oil level indicator, gauges, etc. with dry cloth.
  2. Make a note in the register of the maximum temperature of transformer oil on the dial indicator; reset the indicator.
  3. Check explosion vent diaphragm for any damage or presence of oil.
  4. Check silica-gel breather. If turning pink, replace with dry gel (blue colour) and recondition the old silica-gel. If the silica gel is too wet, check dielectric strength of transformer oil.
  5. Check for any gas collection in Buchholz relay.
  6. Check for leaky oil on transformer body, conservator tank, oil drain valve and foundations. If leaking, take corrective action by tightening bolts, replace gaskets if necessary.
  7. Check if heater in the marshaling box is functioning properly, and if all terminal connections are in order.
  8. Check PRD (Pressure Relief Device) function.

Circuit Breakers and Interrupters

  1. Open the control box cover. Examine the interior and remove accumulated dust; if any part is badly rusted (indicating moisture entry), find the cause, plug the holes, and repaint rusted parts. Check weather-proof gaskets are in good condition (replace if not) to keep the box water-tight. Examine leading-in pipe connections are properly bushed, sealed, and water-tight. Check all pins and check-nuts are in place; also check tie-rod nuts for tightness.
  2. Operate the mechanism at least twice manually. Have it operated on remote control from RCC, keeping the control door open. Observe whether the mechanism functions smoothly without rubbing or obstruction, and if the shock absorber functions properly when the circuit breaker is tripped.
  3. Examine the commutator of the motor and clean with clean mull cloth. Examine carbon brushes and replace if necessary.
  4. Check breather and breather holes for clogging.
  5. Check gear oil level in the mechanism and replenish if required.
  6. Check if heater is functioning properly.
  7. Check interlocks of the device.
  8. Check local position indicator and remote semaphore indicator for operation. Observe correct operation of recording counter. After complete checking, close the cover and test the breaker for operation under remote, local, and manual control.

Isolators

Bus Bars and Connectors

Immediately after switching off supply and earthing the lines, feel by hand all connectors and clamps on busbars and equipment terminals which carry heavy currents to check if they are too hot. If any connection is too hot, it indicates poor contact — open up the contactor, carefully clean the contact surfaces, touch up high spots so mating surfaces bed well together, apply a very light coat of Vaseline, refit, and tighten up.

Control and Relay Panel

  1. Make a note of flag indicators, if any, on relays and then reset.
  2. Check if all indicating and recording instruments are working properly and pointers are not sticky.
  3. Note and record in the register the range of voltage and current variations during a 15-minute period at the time of inspection. Abnormal voltage or current should be noted for corrective action.
  4. Clean the panels externally.

Batteries and Battery Chargers

  1. Take specific gravity and cell voltage of every individual cell and enter in the register.
  2. If the battery is not in a fully charged condition, boost charge should be given as required and trickle charging rate increased to the extent required. This should only be done by a supervisory official after investigating the cause for excessive discharge.
  3. Make a general examination of battery charger. Check earth connection to the body.

Half-Yearly Maintenance

Yearly Maintenance

Maintenance Schedule for Circuit Breakers/Interrupters (Yearly)

This schedule applies to all circuit breakers and interrupters with the following provision: 132kV CBs — every 12 months or after 6 trippings on short circuit. 25kV CBs — 30 trippings on short circuit. 25kV interrupters — 250 openings on normal current for minimum-oil type and 500 openings on normal current for bulk-oil type / vacuum / SF6 types, applicable and recommended by manufacturer.

  1. In oil type: open the extinction chamber, examine the contact rod arcing tip, upper and lower contact fingers, and fixed arcing contacts for burns or pitting. Check contact springs for loss of temper, breaks or other deterioration; replace where necessary. Remove any beads of fused metal from arcing tips and clean pitted surfaces. Change contacts when wear reaches limits prescribed by the manufacturer. Tighten all bolts and current-carrying parts. Check contact rod for correct alignment and setting.
  2. In oil type: test oil sample for BDV. If it falls below 40kV for 132kV circuit breakers and 30kV for 25kV circuit breakers and interrupters, the oil should be purified or replaced.
  3. In oil type: clean the explosion chamber with dry and clean cloth. Remove carbon deposit if any; wash out all traces of moisture from all parts with fresh oil having high dielectric strength and refill with good oil.
  4. The operating mechanism of circuit breakers and interrupters should additionally be attended to annually as under: (i) Lubricate bearing surfaces of roller bearings and sliding surfaces with good-quality machine oil, used sparingly (oil tends to collect dust/dirt); wipe off surplus with clean cloth. (ii) See all links and levers move freely; operate the mechanism slowly by hand to see all parts move freely and no undue friction is noticeable. (iii) Check all pins, latches, etc. for bending and misalignment; check latch carefully so it is not getting worn so as to cause unlatching from vibration or sticking/failure to trip. (iv) Check the mechanism operates with 80% of the normal operating voltage; check and record insulation resistance. (v) Observe operation of trip coil during electrical tripping and the plunger for fast action and freedom from stickiness — the plunger should have sufficient travel to ensure adequate impact that will positively release the breaker latch; check insulation resistance of the coil. (vi) Check the breaker mechanism operates smoothly and freely without binding; check the contact rod is not binding against its guide. (vii) Wash out bearings/pivots etc. with carbon tetra-chloride if dirty and lubricate very lightly. (viii) Examine the accelerating springs and see adjusting nuts (if any) are locked tight. (ix) Measure the length of the breaker stroke and check/adjust in accordance with manufacturer's instructions. (x) Check opening and closing position of auxiliary contacts with respect to main contacts; adjust where necessary. Check condition of contacts and refinish with fine file if burnt or corroded, ensure good contact without excessive friction. Check operating rods/levers are secure and move freely. Smear auxiliary contact surfaces lightly with Vaseline/petroleum jelly. Drain oil from gear box of the spring-charging motor and refill to correct level with the right grade of oil. Measure the duration for which the motor runs to charge the springs and compare with Maker's instructions.

Overhaul Schedule

EquipmentOverhaul Periodicity
132/25kV TransformerAt the end of 10 years, or whenever faulty
Auxiliary TransformerOnce in 7 years
Circuit Breakers and Interrupters (operating mechanism)Once in 10 years, or whenever sluggish operation is observed
ℹ️
Note on Modifying Periodicity
The periodicity of the schedules above may be modified to suit local requirements with the approval of the CEE (Chief Electrical Engineer). Reference: extracts from the 'Manual of AC Traction Maintenance and Operation' (ACTM).
🎯
Exam Focus — Remember the Overhaul Numbers as a Set
10 years / 7 years / 10 years is an easy trio to mix up. Anchor: the MAIN traction transformer and the circuit breaker MECHANISM both get 10-year cycles (or condition-triggered — faulty/sluggish), while only the smaller, lower-duty AUXILIARY transformer gets the shorter 7-year cycle. Also worth remembering: circuit breaker/interrupter overhaul frequency in the YEARLY schedule is actually usage-triggered, not calendar-triggered — 132kV CBs at 12 months OR 6 short-circuit trippings (whichever comes first), 25kV CBs at 30 trippings, and interrupters at 250 (minimum-oil) or 500 (bulk-oil/vacuum/SF6) normal-current openings.